Answered step by step
Verified Expert Solution
Question
1 Approved Answer
World Company expects to operate at 80% of its productive capacity of 72,500 units per month. At this planned level, the company expects to use
World Company expects to operate at 80% of its productive capacity of 72,500 units per month. At this planned level, the company expects to use 31,900 standard hours of direct labor. Overhead is allocated to products using a predetermined standard rate of 0.550 direct labor hour per unit. At the 80% capacity level, the total budgeted cost includes $79,750 fixed overhead cost and $414,700 variable overhead cost. In the current month, the company incurred $488,000 actual overhead and 28,900 actual labor hours while producing 55,000 units. (1) Compute the overhead volume variance Classify each as favorable or unfavorable. (2) Compute the overhead controllable variance. Classify each as favorable or unfavorable Complete this question by entering your answers in the tabs below. Required 1 Required 2 Compute the overhead volume variance. Classify as favorable or unfavorable. (Indicate the effect of each variance by selecting for favorable, unfavorable, and no variance. Round "OH costs per DL hour" to 2 decimal places.) Fixed Overhead Applied Fixed overhead applied Volume Variance Volume variance Required 1 Required 2 > Required 1 Required 2 Compute the overhead controllable variance. Classify each as favorable or unfavorable. (Indicate the effect of each variance by selecting for favorable, unfavorable, and no variance.) Total actual overhead Flexible budget overhead Total Overhead controllable variance
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started