Question
X P(X) 150 0.216241663 250 0.170226556 300 0.137032348 400 0.084565663 450 0.066170513 600 0.041925871 650 0.049258389 700 0.06489999 750 0.081238557 900 0.053301896 1000 0.015739718 1050
X P(X)
150 0.216241663
250 0.170226556
300 0.137032348
400 0.084565663
450 0.066170513
600 0.041925871
650 0.049258389
700 0.06489999
750 0.081238557
900 0.053301896
1000 0.015739718
1050 0.007993195
1150 0.003440118
1200 0.002764448
1350 0.001634109
1400 0.001384987
1450 0.001177614
1500 0.001004365
1. (a) (1 point) Please determine the expected value for X.
(b) (2 points) Determine the standard deviation for X.
(c) (1 point) Determine the coefficient of variation for X
Ordering supply of wood. Each desk requires 10 square-feet of wood. Stan-
dard practice involves ordering an additional 2500 square-feet per month
(regardless of X) as a contingency (spare wood to compensate for mistakes in
carpentry).
2. (1 point) Express the random variable MWO as a simple algebraic function of X (the
number of desks to be produced) being sure to consider the contingency.
3. Determine the following for the random variable MWO.
(a) (2 points) Its expected value
(b) (2 points) Its standard deviation
(c) (1 point) Its coefficient of variation (let M refer to the variable MWO)
4. If the price of wood is 4:5 dollars per square-foot determine the following for the total
cost of wood materials per month (label this Z).
(a) (1 point) Its expected value
(b) (1 point) Its standard deviation
(c) (1 point) Its coefficient of variation
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started