You are a project manager at Fabulous-Houses-R-Us (FHRU) located in London, Ontario. You are assigned as project manager on the following project for the Falcon family (owner). FHRU is a general contractor that subcontracts work to professionals in the London area. You will have a site superintendent (employee of FHRU) available for the project for 50% of the time to provide direction to and overview of the subcontractors.
The Falcon family already owns the land on which the house will be built. Project Scope Statement Project Objective: Construct a custom home within seven months at a cost not to exceed $600,000 (not including cost of land; HST extra). Deliverables:
? A two-storey 2600ft2, 2 bathroom, 3 bedroom, 1 office/den finished home with unfinished basement
? Finished and insulated garage
? Concrete driveway
? All appliances: refrigerator, dishwasher, range, washer, dryer Milestones:
? Start of project August 15
? City of London and other permits approved by September 15
? Foundation placed by October 15
? House in dry condition (roof on, walls intact) November 30
? City of London final inspection by February 15
? Completion (move-in ready) and transfer to owner by February 28 Technical Requirements
? Satisfy Ontario Building Code and City of London bylaw requirements
? Satisfy Ontario Ministry of Labour health and safety requirements
? Garage must accommodate two vehicles plus a 12x10 ft workshop area
? Include electrical system for a future backup generator
? Solar power generation for minimum of 20% of peak electricity needs
? High efficiency natural gas furnace with HEPA air purifier Limits and Exclusions
? The home will be built to the specifications and design drawings as provided by the owner at the start of the project.
? The owner is responsible for landscaping
Customer/Owner Review
? Pat and Sam Falcon
question
- Using a Customer Prioritizing worksheetenter ratings and highlight in yellow the top 5 prioritized customers. List of customers is attached below. define a scale to rate it.
- Using a Simplified Requirements Prioritizing worksheet, create a list of 16 customer requirements in combination with with the top 5 prioritized customers. Requirements should be measurable in some way. Colour the cells of the top 8 customer requirements in yellow. In the same worksheet, provide detailed specifications for each of these top 8 requirements and rationale on why you chose the specifications. Use at least 2 sentences for the rationale.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started