Question

1 Approved Answer

You are building your first house, and are pouring your foundation, which is a 4 concrete slab (assume for simplicity this is equal to 10cm

image text in transcribed

You are building your first house, and are pouring your foundation, which is a 4" concrete slab (assume for simplicity this is equal to 10cm ). It has a moisture content of 75% dry basis and needs to be dried throughout to a moisture content of 25% in order for the forms to be removed. The top of the slab is exposed to air at an equilibrium moisture content of 15% dry basis, leading to an average mass transfer coefficient of 0.1m/s. How long should you wait until you remove the forms? Assume water molecules to be spheres, with a diameter of 0.282nm, the outside temperature is 75F(24C), and the viscosity of the cement is 2.755105kg/ms. You will need to determine the diffusion coefficient of water in concrete - recall that the friction factor of a sphere is 6R (20 points out of the 50 points total). If you are unable to calculate a diffusion coefficient (or simply do not have the time), use 6108m2/s

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Chemical Engineering Fluid Mechanics

Authors: William M. Deen

1st Edition

1107123771, 9781107123779

More Books

Students also viewed these Chemical Engineering questions

Question

Develop a specific plan for being a continuous learner.

Answered: 1 week ago

Question

=+21.18. Use (21.28) to find the generating function of (20.39).

Answered: 1 week ago