Question
You are designing a developmental test to verify that the SRAW safe-arm device (SAD) arms the SRAW in compliance with both the Minimum Arming Distance
You are designing a developmental test to verify that the SRAW safe-arm device (SAD) arms the SRAW in compliance with both the Minimum Arming Distance Critical Technical Parameter (CTP) and the Minimum Engagement Range Key Performance Parameter (KPP) identified in the SRAW TEMP.
As part of the test design process, answer the questions in each area below using short sentence for the responses:
Test Objective: In terms of confirming that the SAD arms the SRAW in compliance with the CTP and KPP requirements mentioned above, what are acceptable SRAW arming distances (or range of distances) in terms of distance from the shooter? Note here that the SRAW arming distance refers to the distance at which the SAD transitions from SAFE to ARM.
Test Scenario / Set-up: In terms of test data, what specific physical parameter(s) should this test measure? How will this be done? Will targets be used and if so, why and where will they be positioned relative to the shooter? Will live or inert warheads be used and why?
Success Criteria: In terms of the safe-arm device meeting requirements, what constitutes success for an individual trial? What results (if any) might disqualify an individual trial from being a test "counter" (i.e., does an individual trial count if the SRAW fails to launch)?
Test Article / Target Configuration: What are the differences (if any) between the SRAW missiles that will be used for this test and those that will be deployed for combat? Additionally, if targets are to be used, how would you describe them in general terms (e.g., moving tanks with reactive armor or stationary shapes made of some other material)?
Confidence Levels / Test Articles / Target Requirements: What reliability and confidence levels are used and why? Based on these values and assuming 0 failures during testing, how many test articles are needed? How many targets are needed? Lastly, if the Program Manager informs you that SAD performance will be evaluated on 60 launches, how many failures are acceptable given the reliability and confidence levels used?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started