You are planning for an essential plant safety upgrade project using your own people. In your planning. based on your experience, you have assembled the
You are planning for an essential plant safety upgrade project using your own people. In your planning. based on your experience, you have assembled the data in the table below: The only way that the outage can be shortened is by using additional resources from contractors and crashing any or all activities where that is possible, but it can be possible at the extra cost as shown in the table below. 2C.1 Draw the network for this job. 2C.2 Mark clearly the critical path. Find the total cost of both methods of completing the work. 2C. 3 What is the optimum duration of the outage at minimum total cost when overheads and other indirect costs of $4500 per day are included? Set out your calculations using the table layout below and show your results with an optimisation chart from a spreadsheet
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started