You are serving as project manager on a project to develop and install hardware and software at hospitals that are part of the same
You are serving as project manager on a project to develop and install hardware and software at hospitals that are part of the same parent organization: a regional health system. As shown in the WBS with progress data, you are well along in the project. Note that each WBS item also indicates (in parentheses) which organizational unit is responsible. In your own words, develop a short, narrative status report for the project steering committee that discusses: a. Status as of the date indicated (August 1) b. Your current forecast of the project status by the end of the project, in terms of schedule and cost budget C. Describe one specific change you would recommend to make now Healthcare System XYZ 560 Mission Street San Francisco, CA In-hospital HW/SW project (thousands of dollars) Actual Progress as of August 1 Name PV EV AC sv CV BAC EAC HOSPITAL HARDWARE/SOFTWARE PROJECT 420 395 476 -25 -81 915 1103 H1.0 Hardware H 1.1 Hardware specifications (DS) H 1.2 Hardware design (DS) H 1.3 Hardware documentation (DOC) H 1.4 Prototypes (PD) H 1.5 Test prototypes (T) H 1.6 Order circuit boards (PD) H 1.7 Preproduction models (PD) 92 88 72 -4 16 260 20 20 15 20 30 10 30 25 30 6 5 -4 10 2 2 40 30 30 30 25 30 100 OP 1.0 Operating System 195 150 196 -45 -46 330 OP 1.1 Kernel specification (DS) OP 1.2 Drivers 20 20 15 20 45 55 76 10 -21 70 25 20 40 OP 1.2.1 Disk drivers (DEV) OP 1.2.2 1/O drivers (DEV) OP 1.3 Code software OP 1.3.1 Code software (C) OP 1.3.2 Document software (DOC) OP 1.3.3 Code interfaces (C) OP 1.3.4 Beta test software (T) 30 45 5 -15 25 31 -6 30 130 75 105 -55 -30 240 30 20 40 -10 -20 100 45 30 25 -15 50 55 25 40 -30 -15 60 30 U 1.0 Utilities 87 108 148 21 -40 200 U 1.1 Utilities specification (DS) U 1.2 Routine utilities (DEV) U 1.3 Complex utilities (DEV) U 1.4 Utilities documentation (DOC) U 1,5 Beta test utilities (T) System integration S 1.1 Architecture decisions (DS) S 1.2 Integration hardware/software (DEV) S 1.3 System hardware/software test (T) S 1.4 Project documentation (DOC) S 1.5 Integration acceptance testing (T) 20 20 15 5 20 35 -15 -30 20 20 20 30 60 90 30 100 17 8 8. -9 20 40 S 1.0 46 49 60 -11 125 9 9 7 2 10 25 30 45 5 -15 50 20 12 10 8 -2 2 15 30 Notes: |C-Coding DEV-Development DOC-Documentation DS-Design PD-Production T-Testing EAC=BAC/(Cumulative CPI)
Step by Step Solution
★★★★★
3.39 Rating (161 Votes )
There are 3 Steps involved in it
Step: 1
a The evaluation of the monitoring of the total project with a Planned Value PV of 420 an Earned Value EV of 395 and a Total Cost of Activity AC of 476 presents a variation in time SV of 25 and a Vari...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started