You are the production manager for a factory. Products are sold to the customer with a lead time of 10 days in batches of 100
You are the production manager for a factory. Products are sold to the customer with a lead time of 10 days in batches of 100 parts. The demand rate is 0.5 batches per day. The factory can make products at a rate of 1 batch per day. Assuming that the SCV for production is 1 and the SCV for batches is also 1. a. Calculate the cycle time