You created 3 0 Control Flow tasks and half of them should be run transnationally. What is the best way to achieve that? Group of
You created Control Flow tasks and half of them should be run transnationally. What is the best way to achieve that?
Group of answer choices
Set transaction property for each of the tasks that needs to run as a transaction
Transaction control is only possible with a Data Flow, but not with a Control Flow
All tasks within a Control Flow must either complete in their entirely, or all roll back
Put transaction tasks inside a container that is configures for transactions