Answered step by step
Verified Expert Solution
Question
1 Approved Answer
You have been asked to estimate the cost of 100 prefabricated structures to be sold to a local school district. Each structure provides 1,200 square
You have been asked to estimate the cost of 100 prefabricated structures to be sold to a local school district. Each structure provides 1,200 square feet of floor space, with 8-feet ceilings. In 2013, you produced 70 similar structures consisting of the same materials and having the same ceiling height, but each provided only 900 square feet of floor space. The material cost for each structure was $36,000 in 2013, and the cost capacity factor is 0.75. The cost index values for 2013 and 2020 are 244 and 389, respectively. The estimated manufacturing cost for the first 1,200-square-foot structure is $15,000. Assume a learning curve of 82% and use the cost of the 40th structure as your standard time for estimating manufacturing cost. Estimate the total material cost and the total manufacturing cost for the 100 prefabricated structures
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started