Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

You have been asked to estimate the cost of 100 prefabricated structures to be sold to a local school district. Each structure provides 1,200 square

You have been asked to estimate the cost of 100 prefabricated structures to be sold to a local school district. Each structure provides 1,200 square feet of floor space, with 8-feet ceilings. In 2013, you produced 70 similar structures consisting of the same materials and having the same ceiling height, but each provided only 900 square feet of floor space. The material cost for each structure was $36,000 in 2013, and the cost capacity factor is 0.75. The cost index values for 2013 and 2020 are 244 and 389, respectively. The estimated manufacturing cost for the first 1,200-square-foot structure is $15,000. Assume a learning curve of 82% and use the cost of the 40th structure as your standard time for estimating manufacturing cost. Estimate the total material cost and the total manufacturing cost for the 100 prefabricated structures

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Research In Forest Economics And Forest Policy

Authors: Marion Clawson

1st Edition

1317362624, 9781317362623

More Books

Students also viewed these Economics questions

Question

How do certain genetic conditions affect motor control?

Answered: 1 week ago