Answered step by step
Verified Expert Solution
Question
1 Approved Answer
You recently noticed that there is a bottleneck in the production line where the finished products are not transported immediately to the packing station. After
You recently noticed that there is a bottleneck in the production line where the finished products are not transported immediately to the packing station. After some discussion with the operations manager, installing a conveyor system from the end of the production line to the packing station seems like a possible solution. If MARR is 20% and the study period is 10 years, select the best conveyor system from the following table using the incremental IRR analysis. Calculate the internal rate of return of the final selected conveyor system. Conveyor systems Initial cost (RM) Productivity (RM/year) Maintenance cost (RM) Salvage value (RM) Slider Bed or Belt over Roller 600000 155000 1300 every year 80000 Live Roller AC 650000 174000 1500 every year 50000 Minimum Pressure Roller AC 800000 196000 2000 every year 150000 Zero Pressure Roller AC 1000000 294000 1500 every year + 2000 every 5 years 100000 Chain Driven Live Roller (CDLR) AC 680000 164000 1200 every year + 3000 every 5 years 120000 Gravity Flexible 500000 118000 1000 every year none
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started