Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

You run a blood testing lab at a large urban hospital. Turn around time for tests is a critical quality characteristic. Lately you have become

You run a blood testing lab at a large urban hospital. Turn around time for tests is a critical quality characteristic. Lately you have become concerned that the variability in turn around times from test to test has increased a lot. You are not hearing a lot of complaints from your internal customers, but the complaints that you do receive are about turnaround times that are wildly different from historical averages. In other words, some waits are have gotten really really long even if the average wait has not changed. On the other hand, you've received positive comments from other internal customers thanking you for getting them their test results in much less time than normal.
Luckily, your team has been tracking turnaround times using statistical process control. The number in the body of the table is the turnaround time in hours for the most common kind of test. Your lab operates round the clock. You remember from SCM301 that you should always use an x bar and r chart together. Which chart is likely to reveal the problem described here?
Sample Test 1 Test 2 Test 3 Ave (x bar) Range (r)
191011
211812
38814
412145
Compute the average or each sample (x bar) and the range of each sample (r) to validate yourself or to help you figure out the answer.--i.e. is it the average or the range that suggests something in the process is changing over time?
Group of answer choices
The averages of the samples (x bar) are very stable; however the range is growing drastically. An R chart would likely show that the process is going "out of control"
The variation (r) within each sample is very stable; however the sample averages (X bars) are growing drastically. An X bar chart would likely show that the process is going "out of control" s
X bar bar (the center line on chart if we were to make one) is stable. So an X bar chart would suggest to us that the process has gone "out of control"
The average of the ranges (R bar)(the center line on chart if we were to make one) is stable. This suggests the process has gone out of control.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic management concepts

Authors: Fred david

13th Edition

9780136120988, 136120997, 136120989, 978-0136120995

More Books

Students also viewed these General Management questions