Answered step by step
Verified Expert Solution
Question
1 Approved Answer
You serve as a chemical engineer at the BP refinery, with responsibility for overseeing operations involving the fractionating column. The column receives an equimolar mixture
You serve as a chemical engineer at the BP refinery, with responsibility for overseeing
operations involving the fractionating column. The column receives an equimolar mixture of
Benzene and Toluene and consists of plates, including a condenser and reboiler, with a total
condenser. This system maintains a constant volume and integrates a heating coil to warm the
crude oil, alongside a shaft for agitating the oil within the tank. Designed to yield a distillate of
purity with a waste in the bottoms, the column operates with a relative volatility of
and a reflux ratio of The feed remains in liquid state at its boiling point, and reflux is
reintroduced to the column at degrees Celsius. The maximum feed rate is set at
kgh with the minimum feed rate established at of this maximum. Sieve plates are employed
in the column.
Upon receiving notification from the refinery manager that the gas plant is nonoperational, you
are tasked with troubleshooting the fractionating column. Subsequent inquiries with unit
operating personnel reveal that the pumparound circulating pump is malfunctioning. Whenever
the hot oil flow to the reboiler is increased, destabilization occurs within the gas plant. Reboiler
heatduty and reflux rates become erratic, and the discharge pressure of the hotoil circulating
pump exhibits significant fluctuations. The operating personnel suggest that a replacement pump
with reduced net positive suction head may be necessary.
As an engineer, your approach to solving this problem and restoring plant operation involves
thorough assessment of the pump malfunction and subsequent actions to address the issue.
This includes evaluating the pump's and columns performance, considering replacement
options, optimizing operating parameters, and collaborating closely with the operations team to
ensure effective resolution and sustained stability in plant operations. Develop a PowerPoint presentation you will give in the next
management giving an overview of how you solved the problem
the gas plant is nonoperational. In your presentation, include
future recommendations to be considered.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started