Your project consists of the construction of a concrete vault on a lane of a major highway, such as the Garden State Parkway. Project and
Your project consists of the construction of a concrete vault on a lane of a major highway, such as the Garden State Parkway. Project and Road information: The roadway is a divided road with three lanes in each direction with a median. There is also a paved shoulder that is 10 feet wide. Speed limit is 55 MPH. Lane width is 12 feet. The length of your work area is 150 feet and you will be working completely in the right hand lane so that the right hand lane and shoulder are to be closed. You may assume that the section of road that you are working on is infinitely straight. Assignment: For this work zone, determine the following: Part A: 1. Length of the Advance Warning Area 2. Length of the Transition Area 3. Length of Termination Area 4. Location and type of all traffic control devices such as signs, barricades, cones, etc. It is suggested that all your traffic control devices be summarized into a spreadsheet by type of device (including identification from Part 2 of the MUTCD), number of device and location of device. (You can assume that the beginning of your Advance Warning Area is Station 0+00). As an example: Location Type of Device Description Size Quantity 0+00 Speed Limit R2-1 30 X 36 2 0+50 Stop Sign R1-1 36 X 36 6 Various Locations Barricade 200 Part B: Prepare a sketch of your proposed work area. You may hand draw the plan if you wish but bonus points are available for a CAD Drawing of your solution
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started