Question
Zero Company's standard factory overhead application rate is $3.63 per direct labor hour (DLH), calculated at 90% capacity = 1,000 standard DLHs. In December, the
Zero Company's standard factory overhead application rate is $3.63 per direct labor hour (DLH), calculated at 90% capacity = 1,000 standard DLHs. In December, the company operated at 80% of capacity, or 889 standard DLHs. Budgeted factory overhead at 80% of capacity is $3,010, of which $1,340 is fixed overhead. For December, the actual factory overhead cost incurred was $3,600 for 850 actual DLHs, of which $1,450 was for fixed factory overhead.
If Zero Company uses a two-way breakdown (decomposition) of the total overhead variance, what is the total factory overhead flexible-budget variance for December (to the nearest whole dollar)? (Do not round intermediate calculations.)
Multiple Choice
-
N/Athis variance doesn't exist under a two-way breakdown of the total overhead variance.
-
$165 favorable.
-
$365 unfavorable.
-
$590 unfavorable.
-
$630 unfavorable.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started