A 500-kVA transformer is at full load and a 0.60 lagging power factor. A capacitor bank is

Question:

A 500-kVA transformer is at full load and a 0.60 lagging power factor. A capacitor bank is added, improving the power factor to 0.90 lagging. After improvement, what percent of rated kVA is the transformer carrying?