This is a small holding section in memory that many systems write data to before writing the
Question:
This is a small “holding section” in memory that many systems write data to before writing the data to a file.
a. Buffer
b. Variable
c. Virtual file
d. Temporary file
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (5 reviews)
a Buffer A buffer is a small holding section in memo...View the full answer
Answered By
Jinah Patricia Padilla
Had an experience as an external auditor in Ernst & Young Philippines and currently a Corporate Accountant in a consultancy company providing manpower to a 5-star hotel in Makati, Philippines, Makati Diamond Residences
5.00+
120+ Reviews
150+ Question Solved
Related Book For
Question Posted:
Students also viewed these Computer science questions
-
Planning is one of the most important management functions in any business. A front office managers first step in planning should involve determine the departments goals. Planning also includes...
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
In this exercise, we will explore the control unit for a cache controller for a processor with a write buffer. Use the finite state machine found in Figure 5.40 as a starting point for designing your...
-
You work in the finance department of a telecommunications firm with a large direct sales force selling high- speed fiber optics access lines to companies wanting telephone and Internet access. Your...
-
In Section 15.7, we investigated an accounts receivable problem. How would the paid category and the bad debt category change with the following matrix of transitionprobabilities? 1000 0.7 0 0.2 0.1...
-
After six months of study, much political arm wrestling, and some serious financial analysis, Dr. Martin Starr, president of Southwestern University, had reached a decision. To the delight of its...
-
PAYBACK PERIOD Refer to Problem 11-1. What is the projects payback? AppendixlLO1
-
Camden Metal Co. makes a single product that sells for $84.00 per unit. Variable costs are $54.00 per unit, and fixed costs total $120,000 per month. Required: a. Calculate the number of units that...
-
Quminin 19 58. Production of Product B has been budgeted at 200,000 units for November. One unit of Product B requires 2 Ibs. of raw material. The projected beginning and ending materials imventory...
-
What will the following code display? try: x = float ('abc123') print('The conversion is complete.') except IOError: print('This code caused an IOError.') except ValueError: print('This code caused a...
-
What is the purpose of closing a file?
-
What is the difference between the waterfall approach and agile project management? lop5
-
Following is a partially completed balance sheet for Epsico Incorporated at December 31, 2022, together with comparative data for the year ended December 31, 2021. From the statement of cash flows...
-
Solve the following linear system by Gaussian elimination with back-substitution without introducing fractions in your row-reduction. If there is no solution, explain why. -3x+8y + 82 = -8 -2x+ y -...
-
Introduction Some predictions are a slam dunk. Retail will continue to be driven by technology. Science fiction is coming to life in the form of robotics and virtual reality. And the Internet will...
-
Oswego Clay Pipe Company provides services of $ 5 0 , 0 0 0 to Southeast Water District # 4 5 on April 1 2 of the current year with terms 1 / 1 5 , n / 6 0 . What would Oswego record on April 1 2 ?...
-
Assume the following excerpts from a company's balance sheet: Property, plant, and equipment Beginning Balance $3,500,000 Ending Balance $3,700,000 $1,100,000 $800,000 Long-term investments During...
-
Patients with spinal cord injuries can lose mobility in their arms and hands, and it is important to find the optimal design of a joystick that will enable them to perform tasks in the most efficient...
-
A liquid flows upward through a valve situated in a vertical pipe. Calculate the differential pressure (kPa) between points A and B. The mean velocity of the flow is 4.1 m/s. The specific gravity of...
-
Design an If-Then statement (or a flowchart with a single alternative decision structure) that assigns 20 to the variable y and assigns 40 to the variable z if the variable x is greater than 100.
-
Part of the following pseudocode is incompatible with the Java, Python, C, and C++ languages. Identify the problem. How would you fix the problem if you were to translate this pseudocode into one of...
-
When ________, only a copy of the arguments value is passed into the parameter variable. a. Passing an argument by reference b. Passing an argument by name c. Passing an argument by value d. Passing...
-
A company has two operating departments: Mixing and Bottling. Mixing has 600 employees and Bottling has 400 employees. If office costs of $320,000 are allocated to operating departments based on the...
-
AAA Company collected $9,100 in May of 2019 for 5 months of service which would take place from November of 2019 through March of 2020. The revenue reported from this transaction during 2019 would...
-
The Gold Company is a national mattress manufacturer. Its Marion plant will become idle on December 31, 2020. Nina Simon, the corporate controller, has been asked to look at three options regarding...
Study smarter with the SolutionInn App