Question:

A team of students participates in a project. The results show that all students are able to finish the project in 7 days. The distribution for the finishing time is given in the following table.image text in transcribed

Define x as the finishing time.

(a) Obtain P(X = 1), P(X = 2), . . ., P(X = 7).

(b) Draw the probability distribution.

(c) Calculate the cumulative function Fx(x).

(d) Draw the cumulative function.