Question: A design modification to the house in Problem 9.5 is desired. A (200 mathrm{ft}^{2}), vented, (12 mathrm{in}). thick Trombe wall is to be added to

A design modification to the house in Problem 9.5 is desired. A \(200 \mathrm{ft}^{2}\), vented, \(12 \mathrm{in}\). thick Trombe wall is to be added to the direct gain system. Assuming the same types of glazing and storage as described earlier, determine

(a) the annual heating auxiliary energy needed 

(b) the Trombe wall mass.

Problem 9.5

A \(2000 \mathrm{ft}^{2}\) house in Boston is being designed with NLC-12,000 Btu/F-day and \(150 \mathrm{ft}^{2}\) of direct gain. The direct gain system includes double glazing, nighttime insulation, and \(30 \mathrm{Btu} / \mathrm{ft}^{2} \mathrm{~F}\) thermal storage capacity. 

Step by Step Solution

3.41 Rating (151 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Sustainable Engineering Questions!