Question:

=+2. Define job descriptions, overlay file and data collection point, etc, as shown below. The J = directive specifies the make-up of the job:

Job number = I Symbol used to represent part on screen = P Route to take = No. 1 Controlling parameters = the parts in this job are to be released only after job 2 is completed, i.e., it is necessary in this case first to initialize the distribution tables Number of parts in the job = 10000