=+3-34. A building has a calculated cooling load of 20 tons, of which 5 tons is latent
Question:
=+3-34.
A building has a calculated cooling load of 20 tons, of which 5 tons is latent load. The space is to be maintained at 72 F db and 50 percent relative humidity. Ten percent by volume of the air supplied to the space is outdoor air at 100 F db and 50 percent relative humidity. The air supplied to the space cannot be less that 55 F db, Assume barometric pressure at sea level, and using the program PSYCH, find
(a) the minimum amount of air supplied to the space in cfm.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Heating Ventilating And Air Conditioning Analysis And Design
ISBN: 9780471470151
6th Edition
Authors: Faye C. McQuiston, Jerald D. Parker, Jeffrey D. Spitler
Question Posted: