=+3-57. A research building requires 100 percent outdoor ventilation air 24 hours a day. This causes a

Question:

=+3-57.

A research building requires 100 percent outdoor ventilation air 24 hours a day. This causes a high latent cooling load relative to the sensible load. The peak cooling load is 100,000 Btw/hr

(29.3 kW) with a SHF of 0.5. A coil configuration available has an apparatus dew point tem-

perature of 45 F (7 C) and can cool outdoor air from 85 F (29 C) db, 70 F (21 C) wb, to 51 F

(11 C) wb. The space is to be maintained at 75 F (24 C) db and 50% relative humidity (RH).

Assume constant air flow and standard sea-level pressure.

(a) Layout processes on Chart la for a system to accommodate the given requirements.

(b) What quantity of air must be supplied to handle the peak load?

(c) Determine other unknown quantities such as coil load, reheat, etc.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Heating Ventilating And Air Conditioning Analysis And Design

ISBN: 9780471470151

6th Edition

Authors: Faye C. McQuiston, Jerald D. Parker, Jeffrey D. Spitler

Question Posted: