=+ (c) The average time for a job to go through the system If the due dates

Question:

=+

(c) The average time for a job to go through the system If the due dates of these jobs are to be assigned by the following formula:

d; == '; + 100 where d; is the due date of job i,

'; is the arrival time of job i, and 100 represents the throughput allowance in minutes: