Fault coverage We consider a NOR gate with 3 inputs, a, b and c and one output

Question:

Fault coverage We consider a NOR gate with 3 inputs,

a, b and c and one output d.

Analyze this gate's functioning when affected by single stuck-at 0/1 faults of the

a, b, c and d signals.

1. Find the test sequence having the shortest length (this sequence will be called optimal test sequence).

2. Trace the coverage curves of i) the exhaustive test sequence, ii) the optimal test sequence, iii) a toggle test sequence.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: