Open PowerWorld Simulator case, which models the Example 6.9 with transient stability data added for the generators.
Question:
Open PowerWorld Simulator case, which models the Example 6.9 with transient stability data added for the generators. Determine the critical clearing time (to the nearest 0.01 second) for a fault on the line between buses 2 and 5 at the bus 5 end which is cleared by opening the line.
Data From Example 6.9:-
Data From Table 6.1 and 6.2 and 6.3:-