Based on data from a manufacturers field-return data system, an estimated 15 field failures occurred. If the
Question:
Based on data from a manufacturers field-return data system, an estimated 15 field failures occurred. If the estimate of field operational hours for the device is 3,000,000 hours, what is the point estimate of the failure rate?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Safety Instrumented System Design Techniques And Design Verification
ISBN: 9781945541438
1st Edition
Authors: Iwan Van Beurden, William Goble
Question Posted: