For a double line-to-ground fault through a fault impedance (Z_{mathrm{F}}), the sequence networks are to be connected

Question:

For a double line-to-ground fault through a fault impedance \(Z_{\mathrm{F}}\), the sequence networks are to be connected _________ at the fault terminal; additionally, _________ is to be included in series with the zero-sequence network.