PowerWorld Simulator case Problem 11_27 duplicates the system from Problem 11.24, except the generators are modeled using
Question:
PowerWorld Simulator case Problem 11_27 duplicates the system from Problem 11.24, except the generators are modeled using a two-axis model, with the same \(\mathrm{X}_{d}^{\prime}\) and \(\mathrm{H}\) parameters as are in Problem 11.24. Compare the critical clearing time between this case and the Problem 11.24 case.
Problem 11.24
Open PowerWorld Simulator case Problem 11_24, which models the Example 6.9 with transient stability data added for the generators. Determine the critical clearing time (to the nearest 0.01 second) for a fault on the line between buses 4 and 5 at the bus 4 end which is cleared by opening the line.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Power System Analysis And Design
ISBN: 9781305632134
6th Edition
Authors: J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Question Posted: