15. In case of multiple price breaks, once a feasible EOQ is determined, the total cost function...

Question:

15. In case of multiple price breaks, once a feasible EOQ is determined, the total cost function is evaluated at the EOQ so determined and each of the points at which the breaks are available. The point at which the total cost is the minimum, gives the optimal order quantity.Mark the statement as T (True) or F (False).