Calculate the asphalt application rate (standard volume) actually achieved by a bituminous distributor under the following conditions:

Question:

Calculate the asphalt application rate (standard volume)

actually achieved by a bituminous distributor under the following conditions: tank gauge reading before spread, 2200 gal (8327 ); tank gauge reading after spread, 200 gal

(757 ); temperature 200°F (93°C);width of spray bar, 20 ft

(6.1 m); length of spread, 4500 ft (1373 m).