Calculate the asphalt application rate (standard volume) actually achieved by a bituminous distributor under the following conditions:
Question:
Calculate the asphalt application rate (standard volume)
actually achieved by a bituminous distributor under the following conditions: tank gauge reading before spread, 2200 gal (8327 ); tank gauge reading after spread, 200 gal
(757 ); temperature 200°F (93°C);width of spray bar, 20 ft
(6.1 m); length of spread, 4500 ft (1373 m).
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For