Question: Suppose it is decided to increase the utilization of the two non-bottlenecks machining stations in the FMS of Problem 19.4 by introducing a new part,

Suppose it is decided to increase the utilization of the two non-bottlenecks machining stations in the FMS of Problem 19.4 by introducing a new part, part E, into the part mix. If the new product will be produced at a rate of 2 units per hour, what would be the ideal process routing (sequence and processing times) for part E that would increase the utilization of the two non-bottleneck machining stations to 100% each. The respective production rates of parts A, B, C, and D will remain the same as they are in Problem 19.4. Disregard the utilizations of the load/unload station and the part handling system.

Suppose it is decided to increase the utilization of the

min in mi min in in in in es 4 15 4 3 342 16 1 1 34 10 9 34 18 8 3 ti-1 2 3 4 1-1 4 2 3 4 11241-1341 1 2 3 4 5|1 2 3 4 5 6 1 2 3 4|1234

Step by Step Solution

3.39 Rating (155 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Ideal process routing would be 1 2 3 1 Consider station 2 letU 2 100 th... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

795-C-S-A-I (783).docx

120 KBs Word File

Students Have Also Explored These Related Artificial Intelligence Questions!