Budgeted variable overhead (per sq. in.) .................... $0.01
Actual overhead incurred ............................... $4,287,482
Budgeted fixed overhead .............................. $3,594,240
Over-absorbed overhead .................................. $797,759
Actual volume (sq. in.) ................................ 141,256,700
Required:
Calculate the budgeted volume amount (in screen square inches) Allington Screen Plant used in computing the plant-wide overhead rate for the year?