The primary control loop of a nuclear power plant includes a time delay due to the need

Question:

The primary control loop of a nuclear power plant includes a time delay due to the need to transport the fluid from the reactor to the measurement point. The transfer function of the controller is
The primary control loop of a nuclear power plant includes

The transfer function of the reactor and time delay is

The primary control loop of a nuclear power plant includes

where T = 0.4 s and T = 0.2 s. Using frequency response methods, design the controller so that the overshoot of the system is P.O. ‰¤ 10%. With this controller in the loop, estimate the percent overshoot and settling time (with a 2% criterion) to a unit step. Determine the actual overshoot and settling time and compare with the estimated values.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Modern Control Systems

ISBN: 978-0136024583

12th edition

Authors: Richard C. Dorf, Robert H. Bishop

Question Posted: