The work breakdown structure for building a house (levels 1 and 2) is shown below: (a) Add

Question:

The work breakdown structure for building a house (levels 1 and 2) is shown below:

The work breakdown structure for building a house (levels 1

(a) Add two level-3 activities to each of the level-2 activities to provide more detail to the WBS.
(b) Select one of your level-3 activities and add two level-4 activities belowit.