Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for

Question:

Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations.
Design A will require 16 hours of lathe time and 4.5 hours of drill time per 1,000 units. Design B will require 7 hours of lathe time and 12 hours of drill time per 1,000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. Finally, there is a sunk cost of $5,000 for Design A and $9,000 for Design B due to obsolete tooling.
a. Which design should be adopted if 125,000 units are sold each year?
b. What is the annual saving over the other design?
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Engineering Economy

ISBN: 978-0132554909

15th edition

Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling

Question Posted: