Question: Venetian Company has two production departments, Fabricating and Assembling. At a department managers meeting, the controller uses flexible budget graphs to explain total budgeted costs.

Venetian Company has two production departments, Fabricating and Assembling. At a department managers’ meeting, the controller uses flexible budget graphs to explain total budgeted costs. Separate graphs based on direct labor hours are used for each department. The graphs show the following.

1. At zero direct labor hours, the total budgeted cost line and the fixed cost line intersect the vertical axis at $50,000 in the Fabricating Department and $40,000 in the Assembling Department.

2. At normal capacity of 50,000 direct labor hours, the line drawn from the total budgeted cost line intersects the vertical axis at $150,000 in the Fabricating Department, and $120,000 in the Assembling Department.


Instructions

(a) State the total budgeted cost formula for each department.

(b) Compute the total budgeted cost for each department, assuming actual direct labor hours worked were 53,000 and 47,000, in the Fabricating and Assembling Departments, respectively.

(c) Prepare the flexible budget graph for the Fabricating Department, assuming the maximum direct labor hours in the relevant range is 100,000. Use increments of 10,000 direct labor hours on the horizontal axis and increments of $50,000 on the vertical axis.

Step by Step Solution

3.31 Rating (157 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a Fabricating Department 50000 fixed costs plus total va... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

100-B-M-A-B-P-C (433).docx

120 KBs Word File

Students Have Also Explored These Related Managerial Accounting Questions!