Question: A plastic extrusion plant will be built to produce 30 million meters of plastic extrusions per year. The plant will run three 8hour shifts per
A plastic extrusion plant will be built to produce 30 million meters of plastic extrusions per year. The plant will run three 8hour shifts per day, 360 days per year. For planning purposes, the average run length = 3000 meters of extruded plastic. The average changeover time between runs = 2.5 hr, and average extrusion speed = 15 m/min. Assume scrap rate = 1%, and average uptime proportion per extrusion machine = 95% during run time. Uptime proportion during changeover is assumed to be 100%. If each extrusion machine requires 500 sq. ft of floor space, and there is an allowance of 40% for aisles and office space, what is the total area of the extrusion plant?
Step by Step Solution
3.35 Rating (176 Votes )
There are 3 Steps involved in it
Production WL 336700 hryr AT 36038095 8208 hryr Chan... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
795-C-S-A-I (660).docx
120 KBs Word File
