Question: A sewer pipe is to be laid from station 10+00 to station 12+50 on a 0.50% grade, starting with invert elevation 83.64 ft at 10+00
A sewer pipe is to be laid from station 10+00 to station 12+50 on a 0.50% grade, starting with invert elevation 83.64 ft at 10+00 Calculate invert elevations at each 50-ft station along the line.