Question: An assembly line consisting of three consecutive workstations produces two radio models: DiGi-l and DiGi-2. The following table provides the assembly times for the three

An assembly line consisting of three consecutive workstations produces two radio models:

DiGi-l and DiGi-2. The following table provides the assembly times for the three workstations.

An assembly line consisting of three consecutive workstations produces two


The daily maintenance for workstations 1,2, and 3 consumes 10%,14%, and 12%, respectively, of the maximum 480 minutes available for each workstation each day.
(a) The company wishes to determine the optimal product mix that will minimize the idle (or unused) times in the three workstations. Determine the optimum utilization of the workstations. [Hint; Express the sum of the idle times (slacks) for the three operations in terms of the original variables.]
(b) Determine the worth of decreasing the daily maintenance time for each workstation by 1 percentage point.
(c) It is proposed that the operation time for all three workstations be increased to 600 minutes per day at the additional cost of $1.50 per minute. Can this proposal be improved?

Minutes per unit Workstati Dii DGi 2

Step by Step Solution

3.44 Rating (163 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

X 1 Nbr DiGi 1 X 2 Nbr DiGi 2 S i idle minutes for station i i 1 2 3 Production times for Station 1 ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

448-M-S-L-P (1436).docx

120 KBs Word File

Students Have Also Explored These Related Statistics Questions!