At a dock, a crane lifts a 4000-kg container 30 m, swings it out over the deck

Question:

At a dock, a crane lifts a 4000-kg container 30 m, swings it out over the deck of a freighter, and lowers the container into the hold of the freighter, which is 8 m below the level of the dock. How much work is done by the crane? (Neglect friction losses.)

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: