Create a new Basin Model for HEC-HMS Problem 5.2 to reflect a detention pond near Junction 2.

Question:

Create a new Basin Model for HEC-HMS Problem 5.2 to reflect a detention pond near Junction 2. Assume that the pond can be modeled in such a way that only the runoff from subbasin 3 should be routed through it. The storage-discharge relation is given as follows:
Create a new Basin Model for HEC-HMS Problem 5.2 to
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Hydrology and Floodplain Analysis

ISBN: 978-0132567961

5th edition

Authors: Philip B. Bedient, Wayne C. Huber, Baxter E. Vieux

Question Posted: