Flextronchip, an OEM manufacturer, has a fifth-generation chip for cell phones, with chip specification of 0.2
Question:
Required
1. Compute the value of k in the Taguchi loss function.
2. Assume that the quality control manager takes a sample of 100 chips from the production process. The results are as follows:
Measurement Frequency
0.1996 ............ 2
0.1997 ............ 5
0.1998 ............ 12
0.1999 ............ 11
0.2000 ............ 45
0.2001 ............ 10
0.2002 ............ 8
0.2003 ............ 5
0.2004 ............ 2
a. Calculate the estimated quality loss for each of the observed measurements.
b. Calculate the expected (i.e., average) loss for the production process as a whole.
3. Using the data from (2) above:
a. Determine the variance in the measured distance between two pins.
b. Calculate the expected loss of the process using the calculated variance, per the method presented by Albrecht and Roth, “The Measurement of Quality Costs: An Alternative Paradigm,” Accounting Horizons (June 1992), pp. 15–27.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Cost management a strategic approach
ISBN: 978-0073526942
5th edition
Authors: Edward J. Blocher, David E. Stout, Gary Cokins
Question Posted: