Hickory Company manufactures two products-14,000 units of Product Y and 6,000 units of Product Z. The company

Question:

Hickory Company manufactures two products-14,000 units of Product Y and 6,000 units of Product Z. The company uses a plant wide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z:

Hickory Company manufactures two products-14,000 units of Product Y and

Activity Measure ________________ Product Y ________ Product Z
Machine-hours .............................7,000 ................... 3,000
Number of setups ............................ 50 .......................150
Number of products ......................... 1 ..........................1
Direct labor-hours .........................8,000 ..................4,000
Required:
1. What is the company's plant wide overhead rate?
2. Using the plant wide overhead rate, how much manufacturing overhead cost is allocated to Product Y? How much is allocated to Product Z?
3. What is the activity rate for the Machining activity cost pool?
4. What is the activity rate for the Machine Setups activity cost pool?
5. What is the activity rate for the Product Design activity cost pool?
6. What is the activity rate for the General Factory activity cost pool?
7. Which of the four activities is a batch-level activity? Why?
8. Which of the four activities is a product-level activity? Why?
9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?
11. Using the plant wide overhead rate, what percentage of the total overhead cost is allocated to Product Y? What percentage is allocated to Product Z?
12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in requirement 11? Why?
13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in requirement 11? Why?
14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in requirement 11? Why?
15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in requirement 11? Why?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Managerial Accounting for Managers

ISBN: 978-1259578540

4th edition

Authors: Eric Noreen, Peter Brewer, Ray Garrison

Question Posted: