In Problem 19.13, compute the average manufacturing lead times for each product for the two cases: (a)
Question:
(a) N = N*, and
(b) N = N* + 10. If N* is not an integer, use the integers that are closest to N* and N* + 10, respectively.
Problem 19.13
A group technology cell is organized to produce a particular family of products. The cell consists of three processing stations, each with one server; an assembly station with 3 servers; and a load/unload station with 2 servers. A mechanized transfer system moves the products between stations. The transfer system has a total of 6 transfer carts. Each cart includes a work holder that holds the products during their processing and assembly, and therefore, each cart must remain with the product throughout processing and assembly. The cell resources can be summarized as follows:
The GT cell is currently used to produce four products. All products follow the same routing, which is 1 ( 2 ( 3 ( 4 ( 5 ( 1. The product mix and station times for the parts are presented in the table below:
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Automation Production Systems and Computer Integrated Manufacturing
ISBN: 978-0132393218
3rd edition
Authors: Mikell P.Groover
Question Posted: