Refer to Example 2. Determine if a plan to use subcontracting at a maximum rate of 50

Question:

Refer to Example 2. Determine if a plan to use subcontracting at a maximum rate of 50 units per period as needed with no overtime would achieve a lower total cost than the plan shown in Example 2. Again, plan for a zero inventory balance at the end of period 6. Regular production can be less than regular capacity.