The estimated capital cost for a chemical plant using the study estimate method (Class 4) was calculated
Question:
The estimated capital cost for a chemical plant using the study estimate method (Class 4) was calculated to be $2 million. If the plant were to be built, over what range would you expect the actual capital estimate to vary?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Analysis Synthesis And Design Of Chemical Processes
ISBN: 9780134177403
5th Edition
Authors: Richard Turton, Joseph Shaeiwitz, Debangsu Bhattacharyya, Wallace Whiting
Question Posted: