A drainage ditch is to be built to carry runoff from a subdivision. The maximum design capacity
Question:
A drainage ditch is to be built to carry runoff from a subdivision. The maximum design capacity is to be $1 \mathrm{million} \mathrm{gph}(\mathrm{gal} / \mathrm{h})$ and it is to be concrete lined. If the ditch has a cross section of an equilateral triangle, open at the top, and if the slope is $2 \mathrm{ft} / \mathrm{mile}$, what should the width at the top be?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Chemical Engineering Fluid Mechanics
ISBN: 9781498724432
3rd Edition
Authors: Ron Darby, Raj P Chhabra
Question Posted: