How many TCY of earth were generated from the excavation described in Exercise 5? Data from Exercise5

Question:

How many TCY of earth were generated from the excavation described in Exercise 5?

Data from Exercise 5

The Figure 16.1 tower crane photograph was taken during the shoring stage of another project. The shoring was bidder-designed based upon soldier piles, wood lagging, tiebacks, and shotcrete. The site measured 200′ × 200′, and the SOG was 20′ below original grade. The mixed-use project included several seven-story apartment towers over one floor of retail at ground level over two floors of underground parking garage. Prepare a GC-generated subcontractor OM plug estimate based upon.

(A). The unit price from the example included earlier in this chapter and/or

(B). A unit price from The Guide or another source, such as a shoring subcontractor.

Figure 16.1

image

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Construction Cost Estimating

ISBN: 9780367902681

1st Edition

Authors: John E. Schaufelberger, Len Holm

Question Posted: