Calculate a contractors cost for performance and labor and material payment bonds using the rate schedule shown

Question:

Calculate a contractor’s cost for performance and labor and material payment bonds using the rate schedule shown in Table 2.4 for each of the following:

A construction project has an estimated cost of $750,000. What is the resultant bond fee as a percentage of the estimated construction cost?

A construction project has an estimated cost of $25 million. What is the resultant bond fee as a percentage of the estimated construction cost?