The following planned figures for a trenching job are available: At a particular time during the construction,
Question:
The following planned figures for a trenching job are available:
At a particular time during the construction, the site manager realizes that the actual excavation will be in the range of 110,000 cubic yards. Based on the new quantity, the site manager figures that there are 30,000 cubic yards left to complete.
From the main office, the following job information is available: